Current schedule for the ROPOS vehicle
Dates |
Ship |
Work site |
Client |
Status* |
| 2010 February 16 to 22 | CCGS Tully | VENUS Observatories | VENUS |
Confirmed |
| 2010 April 6 to 13 | CCGS Vector | EPS Sites | EPS |
Confirmed |
| 2010 May 6 to 25 | CCGS Tully | NEPTUNE Observatories | Neptune Canada | Proposed |
| 2010 July 05 to August 13 | CCGS Hudson | Halifax - NW Atlantic | DFO/NSERC (July 7 to 27) NSERC/CHONe (July 29 to August 12) |
Confirmed |
| 2010 Sept.10 to Oct. 10 |
RV Thompson | Neptune Observatories | Neptune Canada (dates tentative) | Proposed |
| 2010 December 7 to 14 | CCGS Tully | VENUS Sites | NRCAN - VENUS | Proposed |
| 2011 Feb. 22 to March 01 | CCGS Tully | VENUS Sites | VENUS | Proposed |
(*) There are two possible status:
- Proposed/Tentative: A user has expressed intentions of using ROPOS but has not confirmed. The mission dates may change or the mission may be cancelled.
- Confirmed: The mission is confirmed and the ROPOS vehicle cannot be scheduled by other users within those dates.